Snowfall Cascade Lighted Snowflake Wall Decor
❄️ A giant 3D snowflake crown that anchors the whole wall.
✨ One S-curve trail of light that flows down like falling snow.
🌲 Frosted pine, silver and ice-blue baubles keep it festive by day.
📏 About 11.5 in wide, made for narrow walls by stairs and doors.
- Free shipping on 2- & 3-packs
- 30-day returns
- Secure checkout
- Ordered
- Ships
- Delivered
Description
What is it? The Snowfall Cascade is a lighted snowflake wall hanging made for the narrow walls nobody knows how to decorate. A giant 3D snowflake crown sits at the top, and a single trail of light winds down below it in a soft S-curve, dressed with frosted pine, silver and ice-blue baubles and crystal-look drops.
Most lighted snowflakes are flat silhouettes, and most pre-lit swags are greenery with a few bulbs. The Snowfall Cascade combines both ideas in one vertical design we call Crown-to-Cascade Glow: the dimensional snowflake leads the eye, and the glowing trail carries it all the way down.
Hang it on the walls that stay bare every December: beside the staircase, between two doors, at the end of a hallway or on the side wall of the fireplace.
One crown. One cascade. One finished wall.
Size, variants & specs
| Product type | Lighted snowflake wall decoration |
|---|---|
| Design | 3D snowflake crown, S-curve light trail, frosted pine sprigs, silver and ice-blue baubles, crystal-look drops |
| Size | Approx. 11.5 in (29 cm) W x 35.5 in (90 cm) H, being confirmed with our supplier |
| Bundle options | 1 Snowflake, 2 Snowflakes or 3 Snowflakes (same design) |
Need exact dimensions, materials or power details before ordering? Email ohtontumy0@outlook.com and we will reply with the specifications.
What's in the box
- 1 × Snowfall Cascade lighted wall decoration (2 with the 2-pack, 3 with the 3-pack)
Power accessories and hanging hardware are being confirmed with our supplier. Questions before you order? Email ohtontumy0@outlook.com.
Shipping & returns
We carefully prepare your order for shipment. Once your order ships, you'll receive tracking information by email.
- Order processing: 1–3 business days
- Estimated delivery: 7–15 business days
- Shipping cost: flat $3.90 for one snowflake; the 2- and 3-packs ship free
- Shipping destinations: United States only
Returns and damaged items: If your order arrives damaged or you need to request a return, contact us at ohtontumy0@outlook.com within 30 days of delivery. Please include your order number and photos of any damage so our team can help in accordance with our return policy.
Please review the full shipping and return policies before ordering.
The Crown-to-Cascade Glow
A falling-snow scene, in one narrow piece
A giant 3D snowflake crown pours a single S-curve trail of light down the wall through frosted pine, baubles and crystal-look drops, so one narrow piece becomes a whole falling-snow scene.
-
Giant 3D crown
A layered snowflake at the top gives the wall a clear focal point.
-
A trail of light
One S-curve trail winds down below the crown like drifting snow.
-
Made for narrow walls
About 11.5 in wide, for stairs, doors, hallways and fireplace walls.
-
A winter gift
For a mother, a grandmother or a new homeowner.
Where it glows
The walls that stay bare every December
How it works
From crown to tip, one flowing glow
The Crown-to-Cascade Glow is the idea behind the piece: the snowflake leads the eye, and the trail of light carries it all the way down the wall.
-
The crown
One large, dimensional snowflake at the top is the focal point.
-
The cascade
A single trail of light winds down in a soft S-curve, so the eye travels top to tip like falling snow.
-
The dressing
Frosted pine sprigs, silver and ice-blue baubles and crystal-look drops along the trail keep it festive with the lights off.
Why it stands out
Most lighted snowflakes are flat. This one falls like snow.
Most lighted snowflakes are flat silhouettes, and most pre-lit swags are greenery with a few bulbs. The Snowfall Cascade pairs a dimensional snowflake crown with a glowing S-curve trail, in one tall, slim piece.
Wreaths are too wide for the strip beside the stairs. At about 11.5 in wide, this one fits.
One crown. One cascade. One finished wall.
A giant 3D snowflake leads the way
The cascade starts with a large, layered snowflake crown with icy, dimensional detail. It gives the wall a clear focal point that guests notice from across the room. Everything else flows from here.
Light that falls like snow
Below the crown, a single trail of light winds down in a gentle S-curve. Instead of a flat shape that simply switches on, the glow moves your eye from top to tip, like snow drifting past a window.
Made for the wall nobody decorates
At about 11.5 inches wide and 35.5 inches tall, the tall, slim shape fits the spots wreaths and garlands cannot: beside the stairs, between two doors, at the end of a hallway or next to the fireplace.
Still festive with the lights off
Frosted pine sprigs, silver and ice-blue baubles and crystal-look drops are already arranged along the trail. In daylight it reads as finished winter decor; after dark the light trail takes over.
A gift for every winter lover
Elegant and icy, it is an easy gift for a mother, a grandmother or a new homeowner. The 3-pack lets you keep one and give two, and multi-packs ship free in the US.
By the numbers
Real details. No guesswork.
~35.5 in
Approx. height, crown to tip (being confirmed with our supplier).
$39.85
One snowflake, plus $3.90 US shipping.
$14.85
Savings on the 2-pack: $64.85 instead of $79.70, with free shipping.
$34.70
Savings on the 3-pack: $84.85 instead of $119.55, with free shipping.
30
Days after delivery to request a return.
Product and offer facts, not customer survey results. Sizes are approximate. Savings compare with buying single snowflakes at $39.85 each.
Compare your options
Snowfall Cascade vs. other winter wall decor
| Benefit | Snowfall Cascade | Flat lighted snowflake | Pre-lit teardrop swag |
|---|---|---|---|
| Dimensional 3D snowflake focal point | Yes | Usually flat outline | Usually no snowflake |
| Light that flows in an S-curve trail | Yes | Fixed outline | Bulbs scattered in greenery |
| Tall, slim shape for narrow walls | Yes, approx. 11.5 x 35.5 in | Mostly round or square | Varies |
| Looks styled with lights off | Yes - pine, baubles, crystal-look drops | Plain frame | Yes - greenery |
| Icy winter palette (silver, ice blue, white) | Yes | Varies | Often red berries and pinecones |
Why choose ours?
Instead of a flat outline or a swag of greenery, the Snowfall Cascade pairs a dimensional snowflake crown with a flowing trail of light, in a slim shape made for narrow walls.
Generic product types, not brands. Features vary by model.
Shipping & returns
Free US shipping on 2- and 3-packs
Every order ships within the United States. One snowflake ships for a flat $3.90, and the 2- and 3-packs ship free. You can request a return within 30 days of delivery: email ohtontumy0@outlook.com with your order number first.
Please review the full shipping and return policies before ordering.
- Flat $3.90 US shipping for one snowflake
- 2- and 3-packs ship free
- Processed in 1–3 business days
- Delivered in 7–15 business days
Frequently asked questions
Where does the Snowfall Cascade look best?
Its tall, narrow shape is made for walls that are hard to decorate: beside a staircase, between two doors, next to a window, at the end of a hallway or on the side wall of a fireplace. At about 11.5 inches wide, it adds a full winter focal point without crowding the space.
How big is it?
It measures approximately 11.5 inches (29 cm) wide and 35.5 inches (90 cm) tall from the top of the snowflake crown to the tip of the cascade. That is roughly the height of a kitchen counter. Exact final dimensions are being confirmed with our supplier, so please allow for small differences.
Does it still look festive with the lights off?
Yes. Even before the light trail is switched on, the snowflake crown, frosted pine sprigs, silver and ice-blue baubles and crystal-look drops read as finished winter wall decor. During the day it looks styled; after dark the glowing S-curve trail becomes the focal point of the room.
Can I use it outdoors?
Please treat it as indoor holiday decor. Outdoor or weather resistance has not been confirmed for this product, so we do not recommend hanging it outside, on an exposed porch or anywhere it could get wet. Indoors, a stair wall, entryway or hallway shows it off best.
How do I hang it?
Hang it from its top point on a hook or hanger that suits your wall surface and the weight of the piece, then gently shape the light trail and drops so they fall evenly. Hanging hardware and power details are being confirmed with our supplier, so email us before ordering if you need them.
How much is shipping and how long does delivery take?
We ship within the United States only. A single snowflake ships for a flat $3.90, and the 2-pack and 3-pack ship free. Orders are processed in 1 to 3 business days, then delivery takes about 7 to 15 business days. You will receive a tracking link by email.
What if it is not right for my home?
You have 30 days after delivery to request a return. Email ohtontumy0@outlook.com with your order number and we will walk you through the next steps. If your item arrives damaged or not as described, contact us with a photo and we will make it right.
Is it a good Christmas gift?
It makes a thoughtful gift for anyone who loves an elegant winter home: a mother or grandmother, a new homeowner, or a friend with a bare wall by the stairs. The 3-pack lets you keep one and give two, and multi-packs ship free within the US.
How much does it cost, and do bundles save money?
One snowflake is $39.85 plus $3.90 US shipping. Two snowflakes are $64.85, saving $14.85 compared with buying two singles, and three are $84.85, saving $34.70. Both the 2-pack and the 3-pack ship free within the United States, so the bigger packs also skip the shipping fee.
Ready for December
Give your empty wall a snowfall
One giant snowflake, one flowing trail of light, made for the wall by your stairs, your door or your fireplace.
Stairs + entryway: 2 Snowflakes for $64.85, or 3 for $84.85, with free shipping.
$3.90 US shipping for one · 2- and 3-packs ship free · 30-day returns